How to install the floor?

Date:04-02  Hits:10  Belong to:FAQ

First lay the keel on the ground, keeping the distance between the keel and the keel between 25 and 30 cm.

Use a hole punch to drill out the holes in the keel, and use expansion screws to fix the keel to the ground.

Then place the floor over the keel, keeping the floor perpendicular to the keel.

Attach the clasp to the edge of the floor and secure the clasp to the keel with screws.

Fasten the other floor to the buckle and lay all the floors in turn.

Finally, install edge strips on the edge of the floor to complete the installation.

If you have any other questions, please call +86-13357168058 for consultation.

About Us
扫一扫,关注我们最新消息扫一扫,关注我们最新消息
Contact Us

工作时间:周一至周五 9:00-18:00

Contact:MR. Wu

Mobile:+8613357168058

Email:erping@mlantree.com

Address:Room 6, 8th Building, XueYuan Road HaiDian District Beijing China

About us
某某电子有限公司成立于2000年,注册资金1000万,员工40余人,是一家专业做电子电气的公司。优秀的员工,先进的技术,精良的设备,严格的管理是公司得以不断发展养大、产品能够赢得用户依靠的根本所在
Hangzhou Chaobang Copyright ICP 123456789  Technical Support:YouDian Software